Home About us Products Contace us Order Video
 
FRP pipe winding production line by add sand from under
 
FRP Pipe insert the sand
 
The Mould for FRP Pipe
 
Hydraulic Pressure Testing Machine
 
MT6-Minitype Production Line
  (Contect Us)
Tel : +86-318-2195656
Mobile: +86-318-13803185865
Fax: +86-318-2195656
Email :mev12@sina.com
  Products show
 
MT6-Minitype Production Line
 
Click to big...    
MT6-Minitype Production Line
MT6-Minitype Production Line
Ⅰ.The product Specification
  The product Specification: DN100mm≤DN≤DN300mm,0≤L≤9000mm
Ⅱ. Equipment listing (1 set Production Line)
No. Equipment Qty
1 Computer control system(SIMENS) 1Set
2 Winding machine workbench 1Set
3 Winding wagon 2Sets
4 Resin infiltrates system 1Set
5 Scraping superfluous resin system 1Set
6 Automatically supplies material system 1Set
7 Firming agent measurement installment 1Set
8 Main axle turntable 1Set
9 rapid installation system 1Set
10 Add sand system 1Set
11 Truing machine (Truing by diamond) 1Set
12 The wet type dust removal installment (Automatic) 1Set
13 Stripping system(Automatic) 1Set
14 Resin box 1Set
Ⅲ. Technical Parameter(Power:22KW)
1、Diameter of winding products:Φ 100-300mm;
2、Length of winding products:0-9000mm;
3、Winding Angel :45°≤&≤90°;
4、Transporting and feeding form of Methyl Ethyl ketone (Curing Agent )in Resin when winding Adding sand and making lining :the special metric pump with voltage-stabilizing device plus visible flow meter ,measurement accuracy error≤±1%;
5、The supplies material system precise measurement;
6、Type of drive: Chain drive;
7、Type of sand adding :lower adding sand;
8、without the zero drifts;
9、Control mode: Manual, semiautomatic, automatic;
10、The winding wagon can control the main engine revolution and work.。
Ⅴ、Post-sale service
1、Free provides may supply to use for a year to be vulnerable and thespare parts, as follows:
A、The resin shower head 1 pc
B、The sealing member for the Resin pump 5 sets
C、combs 1pc
D、The rubber tube 2 pc
E、The sealing member for the firming agent pump 5 sets
F、The connection for the firming agent pipe
2、The production line free maintains for a year;
3、We are responsible for the production line installment, the debugging,training, up to produces the certified product.